top of page
Canadian flag

Sugar Side

Projects:

01

ISE Case erector study and installation 

  • Resulted in a headcount reduction of 2 full-time workers

02

Robotic Palletizer study and Installation

  • Resulted in a headcount reduction of 3 full-time workers

  • Improved reliability 

  • Fewer rejected loads

03

Hand Palletizing re-engineering study and installation

  • Resulted in a headcount reduction of 5 full-time workers

  • Eliminated potential for worker injuries

  • Fewer Delays

  • No restrictions due to worker capabilities and availability

04

Sugar Cubing Line re-engineering study and installation

  • Resulted in a headcount reduction of 8 full-time workers

  • Improved productivity

  • Fewer delays

05

Fine Liquor Decolorization engineering from Bone Char to Single Pass Carbons

  • Resulted in a headcount reduction of 3 full-time workers

  • Reduced carbon footprint

  • Simplistic operation

  • Lower OPEX

  • Business Sustainability

Steam Side

Projects:

01

Turbine Rotor Upgrade/ Replacement

  • Business Sustainability 

  • Increased Output

02

Circulating Fluidized Bed Conversion

  • Higher steam generation

  • Higher power generation to refinery

03

Heat Recovery Projects resulting in Decreased Energy Consumption

  • Hot vacuum water discharge recovery for primary pre-heating of plant water requirements (10C increased to 35C)

  • Boiler stack heat recovery for secondary pre-heating of plant water requirements (35C increased to 75C)

เชื่อมต่อกับเรา

ระหว่างประเทศ

ที่อยู่

เซอร์รีย์ บีซี
แคนาดา V3R 4W9

วิทย์คณิต

ที่ปรึกษา

ระหว่างประเทศ

ติดต่อ

โทร: 1-604-928-3792
อีเมล: gmustvedt_sci@shaw.ca

© 2035 โดย Barns Consultants ขับเคลื่อนและรักษาความปลอดภัยโดย Wix

bottom of page