Sugar Side
Projects:
01
ISE Case erector study and installation
-
Resulted in a headcount reduction of 2 full-time workers
02
Robotic Palletizer study and Installation
-
Resulted in a headcount reduction of 3 full-time workers
-
Improved reliability
-
Fewer rejected loads
03
Hand Palletizing re-engineering study and installation
-
Resulted in a headcount reduction of 5 full-time workers
-
Eliminated potential for worker injuries
-
Fewer Delays
-
No restrictions due to worker capabilities and availability
04
Sugar Cubing Line re-engineering study and installation
-
Resulted in a headcount reduction of 8 full-time workers
-
Improved productivity
-
Fewer delays
05
Fine Liquor Decolorization engineering from Bone Char to Single Pass Carbons
-
Resulted in a headcount reduction of 3 full-time workers
-
Reduced carbon footprint
-
Simplistic operation
-
Lower OPEX
-
Business Sustainability
Steam Side
Projects:
01
Turbine Rotor Upgrade/ Replacement
-
Business Sustainability
-
Increased Output
02
Circulating Fluidized Bed Conversion
-
Higher steam generation
-
Higher power generation to refinery
03
Heat Recovery Projects resulting in Decreased Energy Consumption
-
Hot vacuum water discharge recovery for primary pre-heating of plant water requirements (10C increased to 35C)
-
Boiler stack heat recovery for secondary pre-heating of plant water requirements (35C increased to 75C)